Terengganu Crude Oil Terminal (TCOT) Project

  • Project Detail: Field Engineering, Installation and Commissioning on TCOT MSS-101
  • Scope: Engineering Support, Construction, Commissioning
  • Client: Transwater API Sdn Bhd
  • EPC / Main Contractor: Transwater API Sdn Bhd
  • Owner / End User: Petronas TCOT

Over 250,000 manhours of Electrical &  Instrumentation installation works at the Petronas Terengganu Crude Oil Terminal in Eastern Malaysia

Malaysia, 2019 – 2020