HKZ Alpha Topside

  • Project Detail: Fabrication Yard Construction of two High Voltage Alternating Current (HVAC) offshore transformer station topsides
  • Scope: Cabling & Fibre Optic Installation
  • Client: Drydocks
  • EPC / Main Contractor: Petrofac
  • Owner / End User: TenneT

Power & Control System Cabling installation, with Fibre Optic Installation & Testing, on the Holland Kust Zuid project at Drydocks in Dubai. The two High Voltage Alternating Current (HVAC) offshore transformer station topsides will connect the offshore wind farm with the Dutch mainland, producing enough renewable electricity to cover the annual needs of over two million households when fully operational in 2023

Dubai – UAE, 2021