AGOGO Field FPSO        

  • Details: ETAP Engineering fro FPSO Construction
  • Scope: Engineering Services
  • Client: NGL Tech
  • EPC / Main Contractor: NGL Tech
  • Owner / End User: Eni

Power System Analysis and Network Modelling using ETAP (Electrical Transient Analyzer Program)

Malaysia, 2022